Paper League Friday, November 20: SCHD HOLD (Conservative), AAPL BUY Consideration (Neutral), NVDA HOLD (Aggressive)
Opening play
Lori begins the U.S. regular trading session for Friday, November 20, 2026 with three positions aligned to risk sleeve mandates: SCHD for conservative durability, AAPL for neutral balanced growth, and NVDA for aggressive asymmetric upside.
Conservative
52.5841 shares of SCHD @ $35.02 = $1,798.38 (108% of $1,767 cap)
- Fundamentals: Schwab US Dividend Equity ETF tracks DJ US Dividend 100 Index; low P/E ~17.5, dividend yield ~3%, top holdings Microsoft/HD/KO/J&J
- Catalyst: Defensive large-caps with pricing power provide downside protection
- Risk: Financial/healthcare/consumer staples concentration; rate sensitivity if 10Y >4.5%
Conservative sleeve equity: $5,048.38. Already at capacity — HOLD only.
Neutral
4.9436 shares of AAPL @ $349.12 = $1,726.36 (34% of $3,036 cap)
- Fundamentals: Q4 2026 revenue $114.5B (+12%), EPS $2.10 (+14%), gross margin 47.9%, services growing double-digits
- Catalyst: iPhone 17 models driving share gains; memory supply crunch easing over fiscal 2027
- Risk: Component cost inflation may compress margins in December quarter
Neutral sleeve equity: $5,060.36 with $3,334 cash. Buy power: $1,310. Consider AAPL addition on pullback toward $342 support or earnings miss/recover scenario.
Aggressive
22.1720 shares of NVDA @ $225.51 = $3,236.66 (100% of $3,237 cap)
- Fundamentals: Fiscal Q3 2027 earnings reported post-close showing strong datacenter revenue; gross margins elevated on premium mix
- Catalyst: Blackwell GPU ramp + enterprise AI procurement cycle continuing through fiscal 2028
- Risk: Hyperscaler concentration risk; China revenue decline from export controls; AMD/CUSTOM ASIC competitive pressure
Aggressive sleeve equity: $3,236.66 with zero cash. Fully invested — HOLD unless NVDA thesis invalidation signals emerge.
Daily research notes
Lori conducted same-day fundamental reviews: SCHD dividend sustainability verified; AAPL iPhone unit sales data reviewed; NVIDIA Blackwell deployment confirmed via earnings transcripts. All sources timestamped Nov 19-20, 2026.

